Welsh Government
CCS was commissioned to design and build the mechanical and electrical infrastructure of a 50 x 50 MRO (Maintenance, Repair, and Overhaul) facility for the Welsh Government at St. Athan airfield, ensuring compliance with Aviation Part 145 regulations. From the initial in-house design to project completion, CCS managed all aspects of the client’s needs, including:
The facility also features an electric radiant heating system, controlled by a custom-built solid-state switching panel, providing efficient and reliable heating for the hangar.
Case Studies
Mechanical and Electrical Fit-Out for Draken MRO Facility, Teesside Airport
Heating and Cooling System for Chelsea O'Connor Hair Salon
CCS was hired to assist Chelsea O'Connor Hair Salon with the installation of heating, cooling,...
Test Flight Simulator Building for BAE Systems
VRF System Installation for Student Accommodation in Norwich
CCS was tasked with designing and installing a Variable Refrigerant Flow (VRF) system for a...
HVAC Case Study
CCS delivered containerized packaged HVAC systems for aircraft hangars, designed for deployment worldwide. These systems...
Welsh Government
CCS was commissioned to design and build the mechanical and electrical infrastructure of a 50...
Aircraft Hangar HVAC System in the Middle East
Harland and Wolff's Methil shipyard
CCS was commissioned to design, install, and commission a Zone 1 electrical system for Harland...
Electrical Installation for Workshop at Wordsmith Mine, Scarborough
CCS was tasked with the design, installation, and commissioning of a new workshop at Wordsmith...
Natural Gas Heating and LED Lighting Upgrade for Local Industrial Factory
CCS recently completed an upgrade for a local industrial factory, enhancing both heating and lighting...
Climate Control System for Local Restaurant in Low Fell, Gateshead
CCS was approached by a local restaurant in Low Fell, Gateshead, owned by close friends,...