CCS was commissioned to design and build the mechanical and electrical infrastructure of a 50 x 50 MRO (Maintenance, Repair, and Overhaul) facility for the Welsh Government at St. Athan airfield, ensuring compliance with Aviation Part 145 regulations. From the initial in-house design to project completion, CCS managed all aspects of the client’s needs, including:
The facility also features an electric radiant heating system, controlled by a custom-built solid-state switching panel, providing efficient and reliable heating for the hangar.
CCS was hired to assist Chelsea O'Connor Hair Salon with the installation of heating, cooling,...
CCS was tasked with designing and installing a Variable Refrigerant Flow (VRF) system for a...
CCS delivered containerized packaged HVAC systems for aircraft hangars, designed for deployment worldwide. These systems...
CCS was commissioned to design and build the mechanical and electrical infrastructure of a 50...
CCS was commissioned to design, install, and commission a Zone 1 electrical system for Harland...
CCS was tasked with the design, installation, and commissioning of a new workshop at Wordsmith...
CCS recently completed an upgrade for a local industrial factory, enhancing both heating and lighting...
CCS was approached by a local restaurant in Low Fell, Gateshead, owned by close friends,...