CCS was tasked with the design, installation, and commissioning of a new workshop at Wordsmith Mine in Scarborough. This project involved the full electrical design to meet the specific requirements of the site.
We installed mains power alongside 110V transformers with multiple outlets, as well as 230V and 415V power outlets to ensure comprehensive power access for various equipment. Additionally, radiant spot heating was installed, equipped with close control and wireless sensors, providing precise temperature management for the workshop environment.
The completed project not only improved the functionality of the space but also enhanced energy efficiency and operational control. This project demonstrates CCS’s expertise in delivering tailored electrical solutions in challenging industrial environments.
CCS was hired to assist Chelsea O'Connor Hair Salon with the installation of heating, cooling,...
CCS was tasked with designing and installing a Variable Refrigerant Flow (VRF) system for a...
CCS delivered containerized packaged HVAC systems for aircraft hangars, designed for deployment worldwide. These systems...
CCS was commissioned to design and build the mechanical and electrical infrastructure of a 50...
CCS was commissioned to design, install, and commission a Zone 1 electrical system for Harland...
CCS was tasked with the design, installation, and commissioning of a new workshop at Wordsmith...
CCS recently completed an upgrade for a local industrial factory, enhancing both heating and lighting...
CCS was approached by a local restaurant in Low Fell, Gateshead, owned by close friends,...