Make an enquiry
0191 7314150


Electrical Installation for Workshop at Wordsmith Mine, Scarborough

CCS was tasked with the design, installation, and commissioning of a new workshop at Wordsmith Mine in Scarborough. This project involved the full electrical design to meet the specific requirements of the site.

We installed mains power alongside 110V transformers with multiple outlets, as well as 230V and 415V power outlets to ensure comprehensive power access for various equipment. Additionally, radiant spot heating was installed, equipped with close control and wireless sensors, providing precise temperature management for the workshop environment.

The completed project not only improved the functionality of the space but also enhanced energy efficiency and operational control. This project demonstrates CCS’s expertise in delivering tailored electrical solutions in challenging industrial environments.

HVAC Case Study

CCS delivered containerized packaged HVAC systems for aircraft hangars, designed for deployment worldwide. These systems...

Read More

Recent Posts

Detract yet delight written farther his general. If in so bred at dare rose lose good. Feel and make two real miss use easy.

Comfort Cooling Solutions (NE) LTD
381 Jedburgh Ct,
Gateshead
NE11 0BQ

Make an enquiry

© Copyright 2024 CCS Comfort Cooling Solutions (NE) Ltd
menuarrow-right linkedin facebook pinterest youtube rss twitter instagram facebook-blank rss-blank linkedin-blank pinterest youtube twitter instagram