CCS recently completed an upgrade for a local industrial factory, enhancing both heating and lighting systems for improved energy efficiency. We decommissioned the outdated gas blower and replaced it with a more energy-efficient heating solution. Additionally, we upgraded the factory’s lighting to 500 lux with LED fixtures, significantly reducing energy consumption while providing better illumination for the workspace. This dual upgrade not only improved the factory's energy efficiency but also created a safer, brighter, and more comfortable environment for its workers. The project highlights our commitment to sustainable, cost-effective solutions for industrial operations.
CCS was hired to assist Chelsea O'Connor Hair Salon with the installation of heating, cooling,...
CCS was tasked with designing and installing a Variable Refrigerant Flow (VRF) system for a...
CCS delivered containerized packaged HVAC systems for aircraft hangars, designed for deployment worldwide. These systems...
CCS was commissioned to design and build the mechanical and electrical infrastructure of a 50...
CCS was commissioned to design, install, and commission a Zone 1 electrical system for Harland...
CCS was tasked with the design, installation, and commissioning of a new workshop at Wordsmith...
CCS recently completed an upgrade for a local industrial factory, enhancing both heating and lighting...
CCS was approached by a local restaurant in Low Fell, Gateshead, owned by close friends,...